UP-Former Palmer Museum Repurposing
Project Number
00-09609.00
Project Status
Complete - Architect/Engineer and Design/Build Selection
Complete - Construction Manager Selection and Other Services
Complete - Trade/Bid Packages
Campus
University Park
Project Stage
RFP
Project Description
The existing art museum building is 51,013 GSF and is approximately 19,000 ASF of art galleries, art storage, art holding/prep/conservation, and the museum's office/security/administrative functions. This project defines a complete change of space/use/function and full renovation/adaptive re-use/transformation of the facility, in addition to building system upgrades and building enclosure upgrades as required and defined herein. The Palmer Repurposing project has a total project cost of $40.4M, which includes a total construction cost of $30.4M.
Penn State Project Leader Name, Email
Package Number | Package Name | Pre-Bid Date/Time | Pre-Bid Meeting | Bid Date/Time | Awarded To | Document |
---|---|---|---|---|---|---|
04A | Masonry (Design Assist) | Mandatory | Smith Masonry | |||
05A | Structural Steel and Misc Metals (Design Assist) | Mandatory | Spicer Welding & Fabrication, Inc. | |||
07C | Roofing and Metal Wall Panels (Design Assist) | Mandatory | Marcon Roofing | |||
08D | Entrances, Storefronts, and Curtainwall (Design Assist) | Mandatory | Nittany Building Specialties | |||
14A | Elevators (Design Assist) | Mandatory | Port Elevator Inc. | |||
23A | Heating, Ventilating, and Air Conditioning (Design Assist) | Mandatory | McClure Company | |||
26A | Electrical (Design Assist) | Mandatory | Biter Electric |