UP-Former Palmer Museum Repurposing
Structural Steel and Misc Metals (Design Assist)

Bid Date / Prevailing Time
Package Number
05A
Pre-bid Date/Time
Pre-Bid Location
Virtual
Pre-Bid Meeting
Mandatory

Project Description: The former art museum building is 51,013 GSF. This project defines a complete change of space/use/function over to a general purpose classroom, class lab, and art storage building, including the complete renovation of the facility, a comprehensive building system upgrade, and building enclosure upgrades. The Palmer Repurposing project has a total project cost of $40.4M, which includes a total construction cost of $30.4M.  DA Partner solicitation is being requested to bring on strategic partners to assist in developing the final design drawings and project budget.

Bidding Information: The bidding will be administered via SmartBid by PJ Dick. Contact Elizabeth Beemiller for the SmartBid invitation to access the RFP and bidding documents.

Bid Submissions: All submissions shall be submitted electronically via PDF to Matt Feuer, Adam Majcher, David Peck, Jesse Wells, and Todd Webber.

Document Distribution
Document Cost
$0.00
Document Distribution Method
SmartBid
Anticipated Document Delivery