UP-Beaver Stadium Renovation
West - Millwork & Countertops, Wood Lockers

Bid Date / Prevailing Time
Package Number
3.14
Pre-bid Date/Time
Pre-Bid Location
Virtual
Pre-Bid Meeting
Recommended but not Mandatory

PRE-BID MEETING: This virtual pre-bid meeting will be through TEAMS and will take place local Eastern time. The CM team will invite all bidders currently listed in Building Connected for the Group #3 work packages with a meeting agenda to follow via an addendum to the bidders. 

Teams Link
Meeting ID: 232 459 383 588
Passcode:  Contact the CM team

 

Bid through Building Connected

Designer Construction Manager
Populous Architects, P.C.
Eric Johnston
(816) 329-4628
[email protected]
Barton Malow AECOM Hunt Alexander
C.L. Cross
(954) 817-8150
[email protected]

 

Document Distribution
Document Cost
$0.00
Document Distribution Method
Electronically through Building Connected
Anticipated Document Delivery