UP-Beaver Stadium MM Project
The Beaver Stadium MM Project – Capital Work is an annual program that addresses major capital improvements in and around Beaver Stadium. The 2024 budget is earmarked for priority work encompassing LED Video upgrades, Server Relocation, Stadium Winterization, and various other enabling work as part of the West Side Renovation Project.
The LED Video Display scope includes replacing the existing North and South ribbon boards, the South scoreboard LEDs, a new South upper ribbon, and a new super ribbon board on the South end. The supper ribbon board will require extensive new steel structure and reinforcement of the existing structure.
Project scope and structural steel needs to support the ongoing MM project will include but are not limited to providing a new primary structure for the super ribbon display, catwalk with grating, access stairs, and existing steel column and beam reinforcement.
Executed NDA and prequalification required for document release. Contact Chris Stout ([email protected]) for the NDA/Confidentiality Agreement.
Package Number | Package Name | Pre-Bid Date/Time | Pre-Bid Meeting | Bid Date/Time | Awarded To | Document |
---|---|---|---|---|---|---|
2.01 | DA Structural Steel & Misc. Metals | Stewart-Amos Steel | ||||
3.01 | Super Ribbon Metal Panels | Recommended but not Mandatory | Mohawk Construction | |||
3.02 | Super Ribbon General Trades | Recommended but not Mandatory | Ridgetop Interiors |