AB-New Academic Building
A new Academic Building at the Penn State Abington campus. The project is a three-story building with a mechanical penthouse located at the western edge of campus off Cloverly Lane. The building program consists of general-purpose classrooms, art classrooms, offices, conference rooms, and general building support. Two existing buildings on site will be demolished, and new utilities will be required at the site location to connect to the existing campus infrastructure.
L.F. Driscoll Prequalification Process & Requirements for All Trades To become a subcontractor with LFD, each subcontractor must demonstrate that it is a viable, productive company. Through an extensive prequalification process, we analyze the subcontractor's past performance, current workload, safety record and financial stability, among other selection criteria. The prequalification processes helps LFD identify the most qualified, reputable subcontractors in the industry.
Required Documents:
- Copy of W-9
- List of company license numbers
- M/W/DBE information, if applicable
- Insurance certificate with all applicable endorsements
- Independent verification letter supporting your EMR for the last three years
- OSHA 300 logs from the last three years
- Safety program manual
- Current financial statement
- Bank information
- Surety/Bonding information
- Three references
- List of current projects
- List of recently completed projects
- Current backlog
Prequalification does not stop when the bid is awarded. Updates are done annually or semi-annually. A formal prequalification process reduces liability and insurance claims, creates safer work sites, and increases a project's potential profitability.
Please email Karen Noel [email protected] to be sent the LFD prequel form.
Bids submitted Building Connected. All bid/contract documents will also be issued through Building Connected. If access to Building Connected is needed, email Sarah Carey at [email protected].
Package Number | Package Name | Pre-Bid Date/Time | Pre-Bid Meeting | Bid Date/Time | Awarded To | Document |
---|---|---|---|---|---|---|
RFQ | LF Driscoll | |||||
15R1 | Millwork (REBID) | Hagen | ||||
21R1 | Exterior Glass (REBID) | Malvern | ||||
22R1 | Interior Glass (REBID) | Zephyr | ||||
37R1 | Elevators (REBID) | Port Elevator | ||||
01 | Asbestos/Hazardous Material Abatement | Mandatory | NOT AWARDED | |||
02 | Building Demolition | Mandatory | Terra Technical Services | |||
03 | Sitework / Utilities | Mandatory | Meco | |||
04 | Sitework / Utilities - Site Concrete | Mandatory | Meco | |||
05 | Sitework / Utilities - Asphalt Paving | Mandatory | Meco | |||
06 | Sitework / Utilities - Signage & Striping | Mandatory | Meco | |||
07 | Fencing & Gates | Mandatory | Pucci | |||
08 | Landscaping | Mandatory | Mayfield | |||
09 | Cast-In-Place Concrete | Mandatory | Madison | |||
10 | Cast-In-Place Concrete - De-attached Mechanical Yard | Mandatory | Madison | |||
11 | GFRC Exterior Panels | Mandatory | Bamco | |||
12 | Masonry & Stone | Mandatory | General | |||
13 | Structural Steel, Metal Deck & Joists | Mandatory | Steward Amos | |||
14 | Miscellaneous Metal Fabrications | Mandatory | Cresent Iron | |||
15 | Millwork & Finish Carpentry | Mandatory | NOT AWARDED | |||
16 | Waterproofing | Mandatory | Ganter | |||
17 | Roofing | Mandatory | Ganter | |||
18 | Doors, Frames, & Hardware | Mandatory | Construction Hardware | |||
19 | Loading Dock Equipment | Mandatory | Setrite | |||
20 | Metal Panels | Mandatory | Bamco | |||
21 | Exterior Glazing | Mandatory | NOT AWARDED | |||
22 | Interior Glazing | Mandatory | NOT AWARDED | |||
23 | Drywall, Rough Carpentry, & Act | Mandatory | Hagen | |||
24 | Drywall, Rough Carpentry, & Act -ACT | Mandatory | Hagen | |||
25 | Tile | Mandatory | Roman | |||
26 | Terrazzo | Mandatory | Roman | |||
27 | Polished Concrete | Mandatory | NOT AWARDED | |||
28 | Flooring | Mandatory | ICF | |||
29 | Flooring - 1st Floor | Mandatory | ICF | |||
30 | Flooring - 2nd Floor | Mandatory | ICF | |||
31 | Flooring - 3rd Floor | Mandatory | ICF | |||
32 | Painting and Special Coatings | Mandatory | Hagen | |||
33 | Wall Coverings | Mandatory | Hagen | |||
34 | Specialties | Mandatory | Material Distributors | |||
35 | Window Treatments | Mandatory | Griffith Shade Company | |||
36 | Signage | Mandatory | ISIGN | |||
37 | Elevators | Mandatory | NOT AWARDED | |||
38 | Fire Protection | Mandatory | Oliver Fire Protection | |||
39 | Mechanical/Plumbing | Mandatory | JBM Mechanical | |||
40 | Site Electric - Medium Voltage Utility and Site Lighting/Misc. Power | Mandatory | Carr & Duff | |||
41 | Electrical | Mandatory | Charles H Macdonald Electric | |||
42 | Fire Alarm | Mandatory | HB Frazer | |||
43 | Security | Mandatory | JW Carrigan | |||
44 | IT - Telecom, ERRCS & DAS | Mandatory | JW Carrigan |