UP-Hamilton Bath Reno - Room Addition
HVAC

Bid Date / Prevailing Time
Package Number
4.12
Pre-bid Date/Time
Pre-Bid Location
Bidders should park at the surrounding garages and meet at the Burrowes side lobby of Warring Commons.
Pre-Bid Meeting
Recommended but not Mandatory

The bid process will be handled through Building Connected. The bid invitation and bid documents can be accessed free of charge through the Building Connected link (https://www.buildingconnected.com/). Access can also be found on the Poole Anderson website under the Subcontractors tab (https://www.pooleanderson.com/subcontractors/).

Document Distribution
Document Cost
$0
Document Distribution Method
Electronically through Building Connected
Anticipated Document Delivery