Chemical and Biomedical Engineering Building

  • Schedule: September 2016 - December 2018
  • BOT Approved Amount: $144,000,000

SCOPE:  The aging Fenske Laboratory was demolished to make way for a new 193,000 SF state-of-the-art research and instructional laboratory building. The lower level, will have a large lecture hall, two labs and support spaces, faculty and grad student offices, and group study rooms. The first floor will include the Knowledge Commons and conference rooms, labs and classrooms, and building support spaces. Upper floors will include offices along the north and east sides of the building with open shared labs in the interior.